Total Installed Capacity


Power Plant Steam GT/N.Gas Wind Hydro Total
Aqaba   5×130 6 656
Rehab Simple Cycle 2×30  60
Rehab Combined Cycle    
Risha  1×97 2×100 297
Amman South 2×30 60
Ibrahimyah 4×0.08 0.32
Hofa 5×0.225 1.125
Total 747 320 1.44 6 1074.44